Projects (References)
- Albania
- Armenia
- Azerbaijan
- Belarus
- Bosnia&Herzegovina
- Bulgaria
- China
- Croatia
- Czech Republic
- Estonia
- Georgia
- Hungary
- Kazakhstan
- Kosovo
- Kyrgyzstan
- Latvia
- Lithuania
- Macedonia
- Moldova
- Mongolia
- Montenegro
- Norway
- Poland
- Romania
- Russia
- Serbia
- Slovakia
- Slovenia
- Sweden
- Tajikistan
- Turkey
- Turkmenistan
- Ukraine
- Uzbekistan
- REGIONAL
- Vietnam
Search on ENSI
Search ENSI-web and in reports
Norway
  • Finstadtunet nursing home, Municipality of Ski            

 

Project manager/ombudsman for building owner acting as contract manager in all aspects related to turn-key contract with contractor. Main tasks are financial and contract controlling, production progress and quality control, risk and environmental assessments, control of conformity to building and environmental regulations and standards, control of Health and Safety manuals including control of conformity to standards.

  

Client: Municipality of Ski, Norway

 

  • Jessheim is- og flerbrukshall, Municipality of Ullensaker

 

The project consisted of the complete process of managing all design and engineering in sports facility containing three handball arenas and one ice hockey arena, total project size approx. 11 000 m2.

 

Client: ØM Fjeld AS, Kongsvinger, Norway

 

  • Evaluation of U-value of windows with different outdoor conditions and calculation of downdraught


Development and testing of tailored user friendly software tool for calculation of window U-value and downdraught, according to standard ISO 15099. The tool is used for evaluation of different types of double and triple window glazing and its thermal properties, and for evaluation of draught risk with increasing height of the glazing.

 

Client: Glass og Fasadeforeningen

 

Location: Oslo, Norway

 

Year: 2010 – ongoing
 

  • Haugjordet Secondary School

ENSI had the role as “Project Director” for the complete project process 

from mapping of, and evaluation of, demands to completion of construction and final handover to client. Main tasks were development of project budgets, financial controlling, risk and environmental assessments, development and control of contracts including performance indicators and technology systems, control of conformity to building and environmental regulations and standards, development of Health and Safety manuals including control of conformity to standards, development of operation and maintenance routines and documentation including energy monitoring and BAS system, and management of design and construction. Total project value 22 500 000 Euro.

 

Location: Ski Municipality 

 

Duration: 01/2002 – 06/2005